One project with two tunnels
The two tunnel project, for Árnafjørð and Hvannasund, is scheduled to be finish this summer 2024.
These two two-way tunnels will replace two old one-way tunnels, which where built in the 60'ies.
The following equipment will be delivered by El-Service:
UPS system, fire alarm system, speaker system, gas measuring equipment, anemometer, radio and associated radiation cable, road signs, main switchboards and control switchboards, heat detecting cable, fiber network, redundant network system, guide lighting, ceiling lights, barriers and related automation as well as stop lights.